138kV to 13.8kV Outdoor Substation

    0.00 $ 0.00 $ 0.0 CAD

    0.00 $

    This combination does not exist.

    Add to Quote

    Power Precision works to efficiently modernize and upgrade high voltage substations.


    Terms and Conditions
    30-day money-back guarantee
    Shipping: 2-3 Business Days

    The 13.8 to 138 kV substation pictured was modernized in 2011 by Power Precision and 3 other companies for the AV Cell Pulp Mill in Atholville, NB.  Power Precision provided the engineering design, drawings, equipment purchase assistance, construction planning and coordination, new protection relay installation and startup commissioning.
    The substation upgrade included:
    • New 138 KV disconnect and ground switch
    • New substation neutral ground resistor (NGR)
    • Addition of a new 138 KV vertical circuit switcher (CSV)
    • Addition of 138 KV potential transformers (PTs)
    • Extension of substation yard and new grounding grid
    • New multifunction voltage protection relays
    • New remote control and indication for disconnect and circuit switcher

    The completion of the upgrade was scheduled for a 20 hour shutdown and was successfully completed ahead of schedule.